Connaught Bridge Power Station is a power station in Klang Valley located near Connaught Bridge in Klang, Selangor. It is the oldest power station in Malaysia.
It was opened on 26 March 1953 by the High Commissioner for the Federation of Malaya, Sir Gerald Templer.
The Station has an installed generation capacity of 895 MW, the third largest of seven sister TNB power plants in the country. The power is produced through a combined-cycle block producing 315 MW, and 4 x GT13E1 open cycle gas turbines of 130 MW each.
As part of the Generation Division of the Tenaga Nasional Group of Malaysia, it shares and operates in support of the parent group’s targets and objectives.
A steam turbine.